From Aging Shopping Mall to Engaged Public Realm

A civic acquisition and stewardship model for the Lloyd Center site




All images of the Lloyd Commons vision are conceptual renderings. They are informed by the Lloyd Center master plan framework developed by ZGF Architects, Urban Renaissance Group, KKR Real Estate Finance Trust, and Field Operations — but are not architectural drawings, engineering documents, or representations of any final design.

The real issue was never demolish

or Preserve

It was always the wall of parking

2.4–2.8M sq ft Structured Parking

Roughly twice the volume of the building it surrounds.

≈1.17M sq ft of conditioned mall space

Already built. Activated for six decades. Closed to the public August 8, 2026 and not yet demolished.

The Alternative

The Lloyd Commons


Four working civic layers stacked and connected


Layer 1 — Street Level

Pedestrian promenades, retail frontages, bike lanes, transit stops, the reconnected grid. The north–south passage through the civic core is held open as a permanent public right of way — a street that never closes.

Layer 2 — Indoor Civic Promenade

The retained core, transformed. Year-round market street, ice rink, community programs, makers, food stalls, events. The civic heart in a City of 164 Rainy Days.

Layer 3 — Roof Commons

Gardens, terraces, greenhouse pods, solar canopies, bioswales, event spaces. The elevated park. Accessible from the civic promenade and the adjacent towers via sky lobbies, bridges and balconies.

Layer 4 — Connected Towers

The same mixed-use mid-rise and high-rise blocks of the ZGF framework, built on the perimeter parcels, with direct access to the roof commons. Residents look down onto the park. Workers step out onto the garden. The towers and the commons are one system.


Lloyd Commons value comes from layering, not flattening. Each layer does different work and together they deliver more civic capacity per acre than any flat park design could.


The civic core becomes a porous civic destination. Courtyard cuts bring sky and daylight into the passages. It reads as a covered street, not a dead end.

The superblock problem was never the civic core. It was the wall of parking. Demolishing the parking structures restores active street edges along NE Halsey and NE Multnomah, the actual barriers.


Civic hearts are for people, not cars. Don't replace the heart with roads and a redundant park. Instead build on top of the world-class momentum that is already pumping through this city.


Four Civic Functions

Built, Proven, and Ready to Reactivate


Small Business Incubator

A prominent cluster of innovative and creative businesses


Lloyd Center Ice Rink

A community touchstone and vital regional amenity




Civic Engagement (Third Place)

Indoor civic commons across 164 rainy and 222 cloudy days annually


Climate Refuge

Designated warming and cooling center during extreme weather events


The Extra Layer

Unpacking the Mall's Under-Recognized Civic Roles

Small Business Incubator

The "No Vacancy" relocation program inside Lloyd Center is an institutional acknowledgment that the building functioned as a small business incubator at a scale that the district lacks the proper ability to naturally absorb. The Save Lloyd appeal record characterizes this concentration as "one of Portland's most prominent clusters of innovative and creative businesses."

Lloyd Center Ice Rink

Operated continuously from 1960 until August 8, 2026 — the first shopping-center ice rink in the United States, and home to the largest Learn-to-Skate USA program in Oregon (1,260 participants last season). The owners' approved master plan does not restore a year-round rink. Bridgetown Ice Skating Collective, an Oregon nonprofit formed in March 2026, is pursuing a year-round rink. It is a prospective anchor for the core — no agreement exists and no funding is committed.

Third Place

Every city needs those places between home and work, the places that hold a neighborhood together. Indoor third places are not amenities here — they are civic infrastructure. Pike Place Market performs the same function for Seattle; Portland's chance to match this already exists. It was fully built and fully proven — and it is still standing, awaiting its next steward.

Climate Refuge

Lloyd Center has been designated a warming and cooling center during heat domes, ice storms and wildfire smoke events. The 2021 heat dome killed 69 people in Multnomah County. And the developer's appeal response acknowledged the climate refuge function but stated uncertainty about whether the replacement project would preserve it. A civic function this crucial cannot be replaced by uncertainty.

1960

Year Opened

This site has served as a civic backbone for decades and still has plenty of life to give.

$50M

Renovation completed 2017

Brand new materials and modern upgrades. The building is not derelict.

Blue + Red

Transit Hub

MAX Blue and Red lines at the door, Streetcar A/B Loops and four bus corridors in the district — one of Portland's most transit-served sites.


The Lloyd Center was not underperforming. It was under-recognized. The civic functions it performed are documented, proven and the infrastructure that delivered them is still standing.

Real World Precedent

Each element assembled from precedents executed at institutional scale elsewhere. Grouped by the claim each one proves — The Mechanics Are Proven


Physical Adaptive Reuse at Scale

Regional-mall and comparable structures at 1M+ SF have been reused rather than demolished at institutional scale and quality.


The answer to: "A mall's systems cannot survive partial retention."

Austin Community College acquired the 1.2M-SF Highland Mall in phases (2010–2012, starting with the JCPenney parcel at $15.7M), reused the mall structure for the Highland Campus and the ACCelerator learning lab, and Phase II (designed by Perkins&Will + ERO Architects) won the 2026 ULI Americas Award for Excellence. Its continued redevelopment was one project in ACC's $386M voter-approved, collegewide bond program (November 2014).

1.2M SF

Regional mall structure retained
Same typology as Lloyd Center.

$386M

Voter-approved bonds
Collegewide bond program (Nov 2014); Highland was one project.

2026

ULI Americas Award
Phase II — Excellence in adaptive reuse.


The answer to: "You cannot build a district around a retained anchor."

Jamestown converted the 2.1M-SF former Sears distribution warehouse into mixed-use retail, office, and food hall while the surrounding 3M-SF district developed around the operating anchor over more than a decade. LEED Gold, institutional owner, still operating.

2.1M SF

Retained anchor
Former Sears distribution warehouse — larger than Lloyd Center.

3M SF

District generated
Built around the operating anchor over 10+ years.

LEED Gold

Institutional quality
Still operating. Proof case at scale.


The answer to: "An ice anchor can't carry a mall redevelopment."

Simon Property Group is redeveloping Northgate with up to ~1,000 homes planned, and chose a brand-new ice facility, the Kraken Community Iceplex (three NHL-size sheets, built on former parking), as the district's civic anchor. Same architect as Lloyd Center: John Graham Jr. (1950 vs. 1960). Seattle built its ice anchor from scratch. Portland's is still standing.

3

NHL-size sheets, built new
Built new on former parking.

~1,000

Homes planned (up to)
Ice as the civic anchor for a mall redevelopment.

1950

John Graham Jr.
Same architect as Lloyd Center (1960). Typological twin.


Spatial reference: this scale of enclosed civic district is normal urban planning.

1.15M SF enclosed civic district integrated with Utrecht's national rail hub. Multi-billion-euro district investment. 30–35M annual visitors. Most-visited mall in the Netherlands.

1.15M SF

Enclosed civic district
Same scale class as Lloyd Center.

€3.2B

District investment
27 sub-projects over 22 years.

30–35M

Annual visitors
Most-visited mall in the Netherlands.


Governance & Stewardship

The organizational model works. Mission-locked entities can hold civic real estate at scale for decades.

Seattle

Chartered public corporation stewarding a 9-acre civic district since 1973. 12-member council. Mature-state analogue for Lloyd Commons at Year 10+. (Oregon has no PDA statute; built from ORS Ch. 65 + ORS 130.193 + ORS Ch. 100.)

Alexandria

City IDA bought the 52-acre anchor site ($54M city funds), ground-leased to Inova Health at $1/year for 90-year hospital occupancy. Anchors the $1B Inova Alexandria Hospital campus. The public-authority-as-permanent-landlord mechanic.

St. Louis

Nonprofit master developer holds eminent domain, tax abatement, and plan-approval powers over a 200-acre innovation district. Institutional-scale governance authority held by a mission-locked nonprofit.

New York

$410M reuse under a public-trust landlord. Commercial income funds the public rooftop and food hall. The mixed-revenue model that carries the civic function.

Portland

Meyer Memorial Trust's $15M April 2026 commitment — Meyer's largest single investment. Community-controlled, phased ownership transfer, intergovernmental partnership. Nearest Portland precedent.

Portland

Seeded with $400 million in 2023; deployed $70 million across roughly a dozen acres in 2025; now raising $600 million more against a $1 billion target. Its structure returns ownership to the community — outside capital enters, and the portfolio exits to a community-owned REIT after five to seven years. The stated return requirement is 'profitable in a bond-return framework, not an equity-return framework.' Three miles from this site, at the same scale class, the model is already running.

Community Equity Layer

The community-investment mechanic works.

Nearly 350 Portland residents hold ~36% ownership in the Plaza 122 commercial building through the Mercy Corps Northwest CIT ($767K invested since 2017; 120+ families have cashed out stakes totaling $310K). Loss-protected via letter of credit from Northwest Bank. Model now replicating to Omaha, Albany NY, Tulsa, and Dallas.

Every element of Lloyd Commons has been executed elsewhere. What has not been executed is the specific assembly: governance layer + physical retention + construction sequencing + community equity, applied to a 1.17M-SF enclosed mall as a whole-site civic acquisition. That is the novelty. Each component is proven.

Sources: ACC Highland ArcGIS StoryMap; ULI Americas Awards 2026; Cortex Innovation Community; City of Alexandria Economic Development + Alexandria Legistar; Hudson River Park Trust / Pier 57; Pike Place Market Preservation and Development Authority; East Portland Community Investment Trust; Albina Vision Trust; Seattle Kraken / Climate Pledge Arena; Jamestown LP / Ponce City Market; Hoog Catharijne / Klépierre-Wereldhave; 1803 Fund.

Portland's Next World-Class Civic Landmark

PDX terminal redefined what arrival in Portland feels like. Lloyd Commons builds off that momentum.


The new Portland International Airport main terminal, opened in 2024, has rapidly become the most photographed piece of civic architecture in the Pacific Northwest. Rather than filling a functional void, it elevated an existing utility into a world-class civic landmark.

Travelers now experience an arrival that immediately communicates Portland's identity, long before they reach the rideshare queue. This design was also conceived by ZGF Architects.


Seattle's Pike Place Market offers a powerful metaphor, for Lloyd Commons. It demonstrates the enduring value of a retained civic interior, continuously operated for nearly a century, evolving into the city's most recognizable "third place" and a major national cultural destination.

Seattle cherishes Pike Place and Portland possessed a comparable civic asset in the Lloyd Center — now closed, still standing, and still available to be stewarded rather than demolished.


ZGF Architects, the firm behind the new PDX terminal, is also the design firm for the approved Lloyd Center master plan. This shared lineage isn't the core argument. However, it serves as crucial evidence that the design capacity responsible for PDX's success is already embedded within the Lloyd Center's planning process.

Lloyd Commons offers a structural approach that enables this design expertise to enhance an existing civic interior, rather than destroying one that completed a $50 million renovation in 2017.


The Civic Sequence

Just as PDX redefined the arrival experience, Lloyd Commons represents Portland's next opportunity to apply its design heritage to a building that has anchored the central city for seven decades.

The Lloyd Center hosted a continuous calendar of civic and community programming — cultural festivals, local meetups, and neighborhood events — through its closure. This activation record demonstrates that the building functioned as an operating public realm, not merely a structure awaiting redevelopment. That record is the asset.


Portland does not need to approve the demolition of the Lloyd Center to build a cultural landmark. The landmark is already standing.


A Cultural Nexus Waiting For Activation


AEG/Monqui music venue, A 68,000 sq ft entertainment venue, is under construction at the former Nordstrom site, opening Q1 2027 — a separate project outside the master plan. This is poised to be a significant draw for Portland's late-night economy. This development underscores the importance of a coherent and appealing surrounding district, which Lloyd Commons aims to preserve by integrating existing cultural assets rather than demolishing and displacing them.

This significant investment was made with the current cultural vibrancy of the Lloyd Center in mind. Demolition would see this new venue open into a prolonged construction zone, undermining its commercial viability. In contrast, retention allows it to debut within a reactivated civic core, maximizing its cultural impact from day one. At the October 2025 groundbreaking, Gov. Tina Kotek called the venue “a catalytic project” and “a cornerstone for the future development of Lloyd Center Mall.” Demolition weakens that foundation.

What Was Here

  • Lloyd Center Ice Rink: Operated continuously since 1960; now closed alongside the mall, leaving Portland with no ice rink inside city limits. The owners' approved master plan does not restore a year-round rink — despite announcing in 2023 that their plan would retain it. February's public hearing drew hundreds of comments, overwhelmingly in opposition, and 600 pages of written testimony; both appeals filed against the plan were about this.
  • Lease Activity: 32 new leases signed since 2021, over 90% existing tenants renewed. Renewals were at below-market rates.
  • Small Business Cluster: Includes Floating World, Brickdiculous, Trackers Earth, Virtua Gallery, Pinball Museum, Legion Sabers, ZRE Music, and Painted Pines.
  • Programmed Civic Calendar: Mall Crawl weekends, chess clubs, kids programming, choir concerts, Rose Show, Holladay Park activations, and an 80s-themed walking group.
  • Climate Refuge Function: Has been officially designated warming and cooling center for the community.

What Lloyd Commons Enables

  • Food Destination: Local food hall and regional anchor tenants.
  • Experiential Retail: Immersive art and cutting-edge experiential retail programming.
  • Civic Services: New library branch and expanded civic services presence.
  • Community Anchors: Co-op grocery, farmers market and other neighborhood-serving businesses.
  • Entertainment: E-sports and tech arena programming.
  • Nightlife Anchor: Programming anchored by the late-night economy activated by the AEG/Monqui venue — drawing foot traffic through the civic core on evenings and weekends, extending dwell time across the district.
  • Public Gathering: Year-round indoor public space, vital for Portland's annual weather.


Lloyd Center was a cultural nexus for six decades. The infrastructure that made it so is still standing.


The approved master plan divides the site into 14 parcels. Lloyd Commons retains the civic core and delivers housing on the surrounding perimeter parcels, exactly as the approved plan provides. Each parcel requires buyers and tenants. A reactivated civic core — with event programming space, a full-size ice rink, local businesses, and a food hall — provides a compelling reason for developers to build. A cleared site with future, undefined open spaces offers every reason to "wait." In a market ranked 80th of 81 for real estate prospects (ULI/PwC Emerging Trends in Real Estate 2026), this distinction determines whether these parcels begin development this decade or the next.


Built-In Demand

The Lloyd Center exists within a convention and hospitality cluster. Demolition places a multi-year, 27.1-acre construction zone in the middle of it during the recovery window that matters most.

2M+

Annual District Visitors

431K convention visitors at the OCC plus 1.6M visitors at Moda Center — in a single recent year.

~$1B

Regional Economic Activity

$331.2M from OCC events plus $670M from Moda Center and the Rose Quarter — generated annually in the Portland region.

3 Venues

One Neighborhood

All within blocks of Lloyd Center. Together they can draw thousands of people into the district on a single event night.

The Oregon Convention Center, Moda Center, and Veterans Memorial Coliseum sit within blocks of Lloyd Center, all served by the MAX transit system. DoubleTree by Hilton Portland — 477 rooms, 45,000 sq ft of meeting space, operating as a convention overflow hotel in this district for decades and is situated right next to the Lloyd Center.

Convention attendees, Trail Blazers fans and concert-goers moving between these venues already pass Lloyd Center's front door. The approved demolition plan routes over two million annual district visitors past a multi-year demolition/construction zone rather than an operating civic destination — at the precise moment Portland's hospitality market is still fighting to recover.


The cultural texture of Lloyd Center existed over six decades. The infrastructure is still standing. The question is whether it gets reactivated or demolished.


The Reality

The Real Choice

Portland is trying to attract investment in a city that outside capital increasingly sees as a harder place to bet on. That is exactly why tearing out the site's biggest amenity is illogical. If the goal is to bring in builders, buyers and tenants, then the strongest move should be to keep the civic space that gave the district identity, activity and daily reasons to visit and can again.

The approval entitled a framework. It funded nothing, sequenced nothing, and required neither a rink nor a timeline.

Lloyd Commons Vision

One path keeps a giant civic core in place: the ice rink, food halls, local business energy, indoor gathering space and the cultural recognition that Lloyd Center carried for six decades — all of it still standing. That gives the next developer something immediate to build beside. Not a promise. A destination waiting to be relit.

Immediate Identity

Established recognition and a reactivation-ready civic core.

Tangible Assets

Ice rink, food vendors, local businesses, gathering spaces — closed, not demolished.

Lower Risk

A well positioned destination to attract further development.

Current Masterplan

The other path clears the site, breaks it into 14 future parcels and asks the market to believe that years of demolition, sporadic construction and future open-space programming will eventually create the same draw. The same civic functions that existed at the Lloyd Center before its closure.


Future Promises

Relies on future conditions, not current reality.

Vacant Parcels

14 empty lots requiring new vision and investment.

High Uncertainty

Years of demolition and construction before activation.


Which Site Would You Rather Build Next To?


Adaptive Reuse VS. Full Demolition

Lloyd Commons housing construction beginning in Year 2. Demolition with the master plan won't even begin until Year 2


Lloyd Commons Potential Timeline


Years 0–2

Stabilization. Interim license. Surface lots demolished.

Years 2–4

Phase 1: 400–600 units. North garage demolished.

Years 4–7

Phase 2: 600–900 units. South garage + anchor wing.

Years 7–10

Phase 3: 700–1,400 units. Remaining garages.

Years 10+

Full build-out. All parcels. Up to 5,141 units, as modelled by the owner — a ceiling, not a commitment.


ZGF Framework vs. Lloyd Commons


Redevelopment

ZGF Full Demolition

Up to 5,141 units

Requires large-scale capital formation before activation

Site inactive during demolition/construction cycle

No activation until first buildings complete

10–20 year timeline (URG's own projection)

Lloyd Commons Phased

Up to 5,141 units, delivered 1,700–2,900 units in Years 2–10 with full build-out by Years 10+

Each phase is delivered mostly on ground-leased perimeter parcels

Civic core active throughout most phases

Concert venue + promenade + rink active from Year 0

First housing delivered Years 2–4

Grid Connectivity

ZGF Framework

Full vehicular grid through demolished center

All connectivity at street level

Perimeter parking demolished ✓

Flat grid

Grid serves cars first

Lloyd Commons

Vehicular grid on perimeter + pedestrian grid through porous civic core

Connectivity on 4 levels: street, promenade, roof, towers

Perimeter parking demolished ✓

Four-layer district

Grid serves people first

It's not save the mall. It's save the civic core — then build the new block around it.

Demolish the garages first. Retain the civic core. Build all up to 5,141 units, as modelled by the owner — a ceiling, not a commitment — on the perimeter parcels — exactly as approved.

2.4–2.8M sq ft

Parking — demolished first

≈450,000 sq ft

Civic core — retained and transformed

Up to 5,141 units

Housing — delivered on perimeter parcels

The core is the mall's internal street network under glass — a connected series of three-storey linear atria, carried on a colonnade at the storefront line, with the ice rink at the crossing. It is not a single hall and not a central court. The retained structure is the network itself. The ≈450,000 sq ft boundary is provisional pending the design decision; it follows the street edges and structural lines.


This Building Was Just Renovated. Now It Is Planned To Be Torn Down.


Mall officials partnered with the Energy Trust of Oregon and the Oregon Department of Energy on equipment replacements and LED lighting upgrades. Public reporting cited a 25-30 percent reduction in energy usage

A full remodel of entrances, the concourse, and building systems, bringing modern energy efficiency to the structure. Construction 2015–2017, completed Spring 2017. Sourced to DCI Engineers.

The recent remodel received Oregon's prestigious Excellence in Structural Engineering Award (2018), recognizing its innovative and sound construction.

How This Gets Funded


The Foundation acquires the site. The perimeter pays for the commons. The core is never sold.


Capital buys the asset. The asset yields forever. The yield sustains the mission.

The civic core is funded as mission capital — philanthropy, public partners, and impact investment — underwritten by fee title to 27 acres.

The ground-leased perimeter is held in perpetuity by the trust. Rising land value on that land stays with the community, and ground rent funds the civic core's operation.

A limited, time-boxed minority of the perimeter's rental units — 1,542 of 5,141 — sits on land sold for cash ($84.8M) to fund the acquisition transition. Each disposition requires a supermajority vote with the consent of easement holders of record. The rest of the perimeter — 3,599 rental units — is ground-leased and held in perpetuity. The ground-leased land is not a liquidation. It is an endowment that builds itself.

This is why the civic core can be preserved. The building is not asked to pay for itself. It is asked to keep doing what it already does and bring people to the site every single day, while the land beneath it does the earning.

The Requirement and the Money Chain

The all-in requirement is $290–320M. Uses of funds: $263.4M of civic-side uses, met by $263.4M of illustrative sources.

$12.87M / yr

Ground rent

$3,575 per rental unit, per year — $298 a month — × 3,599 ground-leased units

$139.6M

Permanent facility

Supported by that ground rent at 1.20× coverage

$84.8M

Land-sale cash

The remaining 1,542 rental units sit on land sold for cash

The rate is per rental unit, not per parcel.

The tenant pays rent to the developer. The developer pays ground rent to the trust. Two assets, two claims.

The civic obligation is fixed; the perimeter value is variable. Uses total $263.4M at any build-out; the perimeter yields in proportion to what is actually built and priced. Up to 5,141 homes are what the approved plan allows, as modelled by the owner. A ceiling, not a commitment. The plan balances at that ceiling — 5,133 of 5,141 units. Ground rent builds as units are delivered; the full $12.87M assumes all 3,599 ground-leased units are built.


No Instrument Can Buy This Mission

Inclusion Is Written Into the Instrument

Inclusion is written into the instrument, not negotiated later. Ground-leased perimeter parcels carry covenants set in the trust document itself: permanently affordable homes on a few parcels — ground-leased, funded by subsidy, and sized to the subsidy actually secured rather than to a fixed share of units — alongside market homes on most parcels. A future board cannot revise it away. The ground-leased land never leaves the community, and neither does the affordability.

No Instrument Can Buy This Mission

The trust instrument sets the tenure and the affordability allocation, and it is enforceable by third parties. Equity that wants governance, debt that wants the land, or a buyer that wants title cannot get any of the three.

Fee title to any perimeter parcel may be disposed of only by supermajority vote of the trust board together with the consent of easement holders of record. The default is retention. Disposition is the exception, and it is the hardest act the instrument permits.

What Must Be Verified First

Garage separation.

The parking structures are understood to be largely external volumes connected to the core through ingress and egress points, sharing utility services to some degree. A survey must establish precisely what is shared, what is structural, and what the sequence of separation and demolition is. This is the single most sequencing-sensitive question in the plan.

Structural capacity.

An assessment of the retained structure for the loads, occupancies and rooftop programme contemplated here, establishing what can be accommodated now, what requires reinforcement, and what belongs to the later roof programme.

Systems and envelope condition.

A survey of the mechanical and electrical plant serving the civic core, and of the envelope and ice plant, to confirm what is serviceable as-is and what requires replacement.

Governance Built in Phases

Oregon legal vehicles, not fantasy institutions. Each phase uses existing law.


1

Phase 0 — Years 0–1

Formation. An Oregon public-benefit nonprofit (ORS Ch. 65) is stood up or an existing entity adopts the architecture. Bridgetown Ice Skating Collective as prospective anchor. Fiscal sponsorship bridges the IRS determination window.

2

Phase 1 — Years 1–2

Acquisition. A Foundation-controlled Property LLC closes on the site. A Perpetual Purpose Trust (ORS 130.193) holds the mission lock with an independent Stewardship Board. ORS 100 flexible condominium separates the civic core from perimeter parcels. Initial MEP separation work.

3

Phase 2 — Years 2–7

Rehabilitation of the retained civic core; perimeter parcels ground-leased under covenant to aligned developers and public partners; the trust retains fee title; operating stabilization.

4

Phase 3 — Years 7–10

Mature stewardship. The institution functions analogously to Pike Place Market's PDA (noting Oregon has no PDA statute; the same function is built from nonprofit law). The perimeter parcels of the approved 14-parcel master plan in active development or completed.

Advocacy work lives in a legally separate vehicle — the APANO (c)(3)/(c)(4) pairing is the Oregon template.

"The greenest building is the one already built."

— Carl Elefante, FAIA, 2007

Portland's own 2024 Embodied Carbon Recommendations were never referenced in the approval, and the demolition of the retained structure was never analysed as a discrete waste event. The City operates a Deconstruction Ordinance and a Low-Carbon Concrete policy. Neither was applied here.

What Lloyd Commons Is and Is Not

Lloyd Commons is an acquisition and stewardship model, not a land-use appeal. The master plan is settled law and nothing in this model asks any government to revisit it. The city's own findings confirm the plan is voluntary and the site can be redeveloped to similar capacity without it. The model works through a transaction: a civic buyer inside the seller's strategic review window.

Multiple Landing Pathways Accommodated

Foundation-Led Acquisition

Whole-site acquisition through a nonprofit-controlled Property LLC.

Existing Entity Adoption

Adoption of the architecture by an existing Oregon nonprofit.

Public-Partner Acquisition

Acquisition under ORS 457.170(3) with the Foundation as long-term ground-lease steward (the Alexandria mechanic).

Self-Sustaining Structure

Each path is sustained by perpetual ground rent from the ground-leased perimeter — 3,599 of 5,141 rental units. Land appreciation on that land stays with the community and the rent covers the civic core's operation. A minority of the perimeter land is sold for cash to fund the acquisition.

Portland Has Already Asked the Question

The City is studying how to acquire and steward land and buildings for long-term affordability. Lloyd Commons applies that approach at 27.1 acres.

Resolution 37703 — April 2025

Adopted unanimously on 2 April 2025. Directed the City to study social housing and other alternative housing models.

PHB Report — August 2026

Advancing Housing Stability in Portland, published by the Portland Housing Bureau on 31 August 2026. Five recommendations; acquisition named as a near-term priority.

Recommendation 4

Acquire and Steward Land and Buildings. The report lists municipal ownership and public ground leases among the stewardship structures to evaluate.

Lloyd Commons is a permanent civic core and a permanently affordable housing component, held through acquisition and ground lease.

The permanence is not conditional. The quantity is. Whatever is delivered as affordable stays affordable permanently. How much of it there is is sized to the subsidy actually secured.

The report also finds that, under current Portland market conditions, the rents needed to support the full cost of new construction exceed comparable market rents.

Sources: portland.gov — Resolution 37703; Portland Housing Bureau, Advancing Housing Stability in Portland (Aug 2026), Part 3, Recommendation 4; PHB Winter 2025–26 RFQ (20 March 2026).

Portland Must Learn From Its Past To Build A Better Future



WE CAN DO BETTER


The Window

  • The master plan is settled. The mall is closed. The building stands — as of August 2026, no demolition permit has been filed.
  • The master plan is voluntary, and the site can be redeveloped to similar capacity without it.
  • The first ask is organizational, ahead of the financial one: one legal counterparty that can hold an option, and public and civic partners aligned behind it. Everything else follows from that and it is the difference between a demolition and a district.

From Aging Shopping Mall to Engaged Public Realm




Read The Full Proposal

Gamma embed

The Lloyd Commons

A Civic Acquisition and Stewardship Model for the Lloyd Center Site A Proposal for Civic Acquisition — September 2026For the Streamlined Proposal ←click here Developed by Nicholas Primm — Resident of Portland, Oregon. thelivingstack.substack.com|linkedin Urban Planning Adaptive Reuse Civic Inf

Contact

Email:

Urban PlanningAdaptive ReuseCivic InfrastructurePortland, Oregon

Sarif Consulting | Portland-based strategic and creative production firm | Sustainable Urban Planning